August 29, 2026
11:14 AM
Aerial photos of concrete forms for a new walkway under The Spike of Fast & Furious Hollywood Drift.
• Cul-de-sac likely for a snack stand
• Concrete form at left to join with the current walkway. Likely the current route is widened. Unknown how netting will be done there.