September 5, 2026
2:20 PM
Aerial look at the development of the Monsters Inc door roller coaster.
Track supports are seen at right. The tallest are for a swoop of ride routing through this space. Lower supports for unload of the trains.
Trains then move into load at left. With high curved ceilings.