September 20, 2026
12:45 AM
3 aerial photos of construction of the loading section of the Monsters Inc suspended door roller coaster.
Trains will swiftly rise vertically and level to near the ceiling. Then launch into Scene 1.
3 aerial photos of construction of the loading section of the Monsters Inc suspended door roller coaster.
Trains will swiftly rise vertically and level to near the ceiling. Then launch into Scene 1.