the BERM Walt Disney World Map Archive
October 31, 2026 12:46 AM

At left in this aerial photo are supports for track leading into unload at the Monsters Inc suspended door roller coaster.
Arrow where steel sheeting is being added for a floor above unload. The ride will swoop through this upper floor and return to the main ride chamber.

View original on Mastodon