the BERM Walt Disney World Map Archive
October 31, 2026 10:02 AM

Arrows in this aerial photo toward track that will be placed at the ceiling in Scene 1 of the Monsters Inc suspended door roller coaster.
Rows of doors rise will flat from the loading platform, and then move swiftly into these track sections.

View original on Mastodon