November 6, 2026
8:45 PM
In this aerial photo of the Monsters Inc roller coaster construction:
1 Track supports leading into unload.
2 Track supports in a floor above unload. Steel sheeting for the concrete floor is seen. The ride will swoop through here and return to the main chamber.