Heavy rain today. Muddy water from the Fast & Furious Hollywood Drift work site flowed thick across the CityWalk walkway. Spilling over a silt fence and into the lagoon.
The aerial archive
A permanent archive of @bioreconstruct’s aerial photos of construction around Walt Disney World and Universal Orlando — full-resolution originals, preserved daily. Every post links back to its source.
- 25,931
- photos
- 21,426
- posts
- spanning
- November 2023 – August 2026
- latest
- August 13, 2026
Jump to a month
Show every monthPoseidon's Fury demolition now visible from the bridge between The Lost Continent and Seuss Landing.
Work in progress for a #HHN event kitchen near Animal Actors.
Hellraiser themed #HHN food truck.
A #HHN event kitchen near Cafe La Bamba.
Practically every day the #HHN scare zone sets get new scenic elements and additional dressing.
Fast & Furious Hollywood Drift seen from the second level of CityWalk.
Fast & Furious Hollywood Drift tracks between Music Plaza. The overbanked hill at right is for cars launching from the station to CityWalk. Hill at left for returning cars.
In this photo of Fast & Furious Hollywood Drift 1 Concrete forms for a footer 2 Track connection where a support will span to the footer. 3 Set of footer bolts. These were extracted from the original footer concrete.
18 new style trash cans have been placed between the Islands of Adventure plaza and The Spike of Fast & Furious Hollywood Drift. 9 of each style. About half are side-by-side like seen here.
Theming for the seasonal #HHN Dead Coconut Club is underway.
Direction sign to Mythos Restaurant on a construction fence in The Lost Continent.
More sightings have become possible of Fast & Furious Hollywood Drift behind the demolition of Poseidon's Fury.
Cars in Fast & Furious Hollywood Drift will go through the inversion at top center, then return to the station through the hill seen just below.
Current work at a track-support connection in Fast & Furious Hollywood Drift.